top of page

Maasdijk (NL) 2022

The formation water was treated for re-injection into the formation. Not only was the disposal of the test water eliminated but the productivity of the well improved significantly. This project was executed as part of a multi-well geothermal drilling and completion project. The specific challenges were the small available footprint and especially the need to conform to the project deadlines dictated by the expensive drilling rig

machinery
water filtering steps
geothermal drill site
bottom of page